DC Aviation Group Completes 48-Month Check on Challenger 605
/DC Aviation’s Maintenance team at Stuttgart Airport (EDDS) has successfully completed a 48-month check on a Challenger 605. The comprehensive maintenance work included a full cabin refurbishment.
In addition, an extended upgrade of the Proline 21 avionics system was implemented. This includes the installation of ADS-B (Automatic Dependent Surveillance-Broadcast). This air traffic control system for displaying aircraft movements in airspace has been mandatory in the USA and the UAE since January 1, 2020. This system enables the aircraft's route to be tracked, as it determines its exact flight position via satellite navigation and periodically broadcasts it.
The upgrade also includes the implementation of the TOSE (Take-Off Safety Enhancement) system.